UPDATES

Colas installs new low carbon bridge in Dover

[ad_1]

A brand new 31.5m bus, pedestrian and cycle bridge has been put in throughout the A2 at Whitfield to the north of Dover over the weekend.

The bridge will primarily serve Dover’s new Fastrack electrical bus service, crossing the A2 between the Whitfield Roundabout and the A256 turn-off.

Contractor Colas positioned the highest of the bridge on 14 July, with a bit of the A2 closed over the weekend to allow works to happen. A 60-hour operation passed off from 9.00pm on Friday, 14 July by means of to five.00am at this time, 17 July, throughout which 5 30m metal beams weighing 14.5t have been lifted into place from the A2 by a 150t crane. The beams have been fabricated regionally by Nusteel Buildings primarily based in Lympne, Hythe.

Previous to graduation of the operation Colas mission director Nicholas Dobbie mentioned in a press release: “This key part of the mission has required in depth planning and liaison. We’re wanting ahead to seeing the regionally produced metal beams in place, prepared for us to start work on the subsequent steps to finish the bridge development.”

Dover Fastrack will hyperlink housing at Whitfield in north Dover and proposed housing on the former Connaught Barracks web site subsequent to Dover Fortress – with Dover’s centre and Dover Priory Station.

Key sections of the Fastrack route have been designed for pedestrian and cycle entry, together with the brand new bus, cycle and pedestrian-only bridge throughout the A2. A brand new hyperlink street from the B&Q roundabout in Whitfield to Dover Highway at Guston can be deliberate.

A key purpose of Fastrack is to assist the native space to grow to be carbon impartial by 2050. A fleet of latest electrical buses have been bought for the service, which will even hyperlink with Southeastern practice providers. The scheme is supported by central authorities with a £20.9M from grant from Properties England to assist stimulate new housing improvement. Dover District Council is working in partnership with Kent County Council and the Highways Authority on the mission.

Dover District Council cupboard member for transport Jamie Pout mentioned: “Putting in the bridge throughout the A2 is a key part in development of Dover’s first zero-emission bus route. It’s additionally a great instance of how the Council is working with Properties England and Kent County Council (KCC) to ship infrastructure and public transport options to assist new properties.”

Kent County Council cupboard member for highways and transport David Brazier mentioned: “These works are an thrilling milestone in our progress of Dover Fastrack. As soon as working, Dover Fastrack will supply key hyperlinks to new housing developments together with higher entry to high-speed practice providers and the incredible points of interest that the city has to supply.”

 

 

 

Like what you’ve got learn? To obtain New Civil Engineer’s day by day and weekly newsletters click on right here.

[ad_2]

Leave a Reply

Your email address will not be published. Required fields are marked *